5 Commissioning [specialist]
18 99E13331xx-mub-en - V08 2022/07
5.11 Finish without protocol
Completes the commissioning without a further saving on an external USB flash drive. The
settings made during the commissioning can be changed at any time in the corresponding
sub menus.
After the commissioning is completed, the controller is ready for use.
Language Selection of the menu
language
German, Polish,
English, French,
Spanish, Italian,
Dutch, Swedish
German
Controller type Setting the type of controller Single controller,
client, server 1,
server 2, server 3,
MB3.10,
deactivated
Single controller
Date Setting the date - -
Time Setting the time - -
Auto. Daylight
saving
time/standard time
Activate the automatic
change to daylight saving
time /standard time
Yes, No Yes
Cascade Operating parameters of the
cascade
- -
Scan Modbus Identification of the modules - -
Nominal
temperature
Setting the hot water
nominal temperature
35 ... 75 °C 60 °C
Functions Submenu of the functions - -
Finish with protocol Save with protocol - -
Finish without
protocol
Save without protocol - -