EasyManua.ls Logo

Pentair STA-RITE SC-75P - Page 130

Pentair STA-RITE SC-75P
176 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
English
Mounng the Power Center Enclosure
1. remove the 4 screws securing the Power Center cover and remove the cover
2- Posion the Power Center on a at surface such as a wall or post and drill 4 holes through the plasc enclosure at the
specic locaons with a small bit drill (must be lower than screw diameter) in order to mark the wall with each of the 4 screw
locaons.
3- Drill 4 holes of 6mm at the marked locaons, install anchors if necessary
4- Posion the Power Center aligning the holes on Wall and in the Power Center
5- Install and ghten four mounng screws (the screws must enlarge the holes previously drilled in the power center so
that IP rang is maintained).
Wall Mounng area
Connecng the SC-75 Cell Cable to the Power Center
Connect the SC-75 cell power cable to the power center as follows:
1. IMPORTANTWARNING:BesurethatthePowerCenterACpowerlineisswitchedOFFbeforeconnecngthepower
cord connector to the Power Center.
2. Align the SC-75 cell power cord connector with the socket on the boom of the Power Center and insert the connector.
Rotate the round socket nut unl it locks the connector in place.
Connector Socket Nut
To SC-75 Cell

Table of Contents

Related product manuals