Routine maintenance
63
Install the tip mount into the instrument mirror module changer by fitting it
onto the two guide pins. Tighten the brass screw.
Gently pull out each tube through the dispenser connection piece in the
direction of the dispenser so the silicone connector is pulled as close as
possible to the dispenser connection piece.
Arrange the tubing so that it rests on top of the support piece. This prevents
the tubing getting in the way of the mirror module changer.
Close the instrument lid.
Make sure that the correct liquid reservoir and liquid are installed for each
pump and that the aspiration tubes go to the correct reservoirs.
Close the dispenser lid.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the PerkinElmer EnVision and is the answer not in the manual?

PerkinElmer EnVision Specifications

General IconGeneral
Light SourceXenon flash lamp
SoftwareEnVision Manager
Read ModesAbsorbance, Fluorescence, Luminescence, Time-Resolved Fluorescence, Fluorescence Polarization
Plate Formats384-well
Detection TechnologyPMT