Mounting and commissioning the machine
8 - 9
8
.02 Commissioning
Before commissioning the machine, clean it thoroughly, fill the oil pan with oil
and adjust the oil level, see Chapter 10 Care and Maintenance!
● Examine the machine, in particular the electric cables, for any damage.
Have qualified personnel check whether the machine can be operated with the
available voltage and whether it is connected properly. If there are any
irregularities do not operate the machine!
The machine may only be connected to an earthed socket!
When commissioning the machine or after a long period of non-operation,
operate the machine with max. 2000 spm for the first 10 minutes! Danger of
damage to the machine!
● When the machine is running, the balance wheel must turn towards the operator. If this is
not the case, have the motor adjusted by qualified personnel, see Motor Service Manual.
8.03 Switching the machine on/off
● Switch the machine on or off in accordance with Chapter 7.01 Main switch.