35
7 Commissioning
Before commissioning the machine, it must be thoroughly cleaned and then
oiled., see chapter 9 Care and maintenance in the instruction manual.
Check the machine, particularly its electrical wiring and pneumatic tube
connections, for any damage.
Have skilled personnel check if the machine can be operated with the available mains vol-
tage.
Do not operate the machine if there is any discrepancy.
The machine may only be connected to an earthed socket!
In the case of machines with PicoDrive and P45 PD2-L control unit, have specialists
check the basic position of the machine drive before commissioning the machine (see
Chapter 7.02 Basic position of the machine drive).
7.01 Switching the machine on/off
Switch the machine on (see Chapter 7.01, On/off switch in the instruction manual).