20
10. Set Pump Switch (X, page 11) to NORMAL. Turn Hydraulic Pressure Control
CLOCKWISE (N, page 10) increasing material pressure to 400 psi (27 bar). Both
Material Pressure Gauges (H, K, page 10) should read the same.
11. Check all connections for leaks.
12. Bundle all Heated Hose Connections ensuring that there are NO kinks in the TSU Cable
or Air Hose. Wrap with Electrical Tape to securely hold all components in place and
minimize places for bundle to snag onto job site protrusions.