EasyManua.ls Logo

PMC PH-40 - Page 24

PMC PH-40
93 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PROPORTIONER PURGING
20
10. Set Pump Switch (X, page 11) to NORMAL. Turn Hydraulic Pressure Control
CLOCKWISE (N, page 10) increasing material pressure to 400 psi (27 bar). Both
Material Pressure Gauges (H, K, page 10) should read the same.
11. Check all connections for leaks.
12. Bundle all Heated Hose Connections ensuring that there are NO kinks in the TSU Cable
or Air Hose. Wrap with Electrical Tape to securely hold all components in place and
minimize places for bundle to snag onto job site protrusions.

Related product manuals