EasyManua.ls Logo

Polaris GENERAL 2018 - Page 465

Polaris GENERAL 2018
690 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
9929375 R02 - 2016-2019 GENERAL / GENERAL 4 Service Manual
© Copyright Polaris Industries Inc.
9.45
3. Torque the banjo bolt
e
to specification.
TORQUE
Brake Line Banjo Bolts:
15 lb-ft (20 Nm)
4. Install the adjustment set screw and turn clockwise
until stationary pad contacts disc, then back off 1/2
turn (counterclockwise).
5. Bleed the brake system. Refer to “Brake Bleeding /
Fluid Change”page 9.35 procedure.
6. Install front wheels. Refer to “Wheel
Installation”page procedure.
7. Field test unit for proper braking action before putting
into service. Inspect for fluid leaks and firm brakes.
Make sure the brake is not dragging when pedal is
released. If the brake drags, re-check assembly and
installation.
NOTICE
If new pads are installed, refer to “Brake Burnishing
Procedure”page 9.36.
BRAKE SYSTEM

Table of Contents

Related product manuals