14 Appendix
14.1 Benchmark commissioning checklist
CONDENSING BOILERS ONLY
The condensate
drain has been installed in accordance with the manufacturer’s instructions and/or seY8976SB/6455SB
COMBINATION BOILERS ONLY
Is the installation in a hard water area (above 200ppm)? Yes No
Yes No
DOMESTIC HOT WATER MODE Measure and Record:
Gas rate m³/hr O
R ft³/hr
Burner operating pressure (at maximum rabm)etar OR Gas inlet pressure at maximum rabmetar
Cold water inlet temperature °C
Hot water has been checked at all outlets Yes Temperature °C
I/min
CENTRAL HEATING MODE measure and record:
Gas rate m³/hr OR ft³/hr
Burner operating pressure (if applicabl rabm)e OR Gas inlet rabmerusserp
°C
Central heating return temperature °C
ALL SYSTEMS
’s seYsnoitcurtsni
What system cleaner was used?
What inhibitor was used? Quantity litres
Yes No
CONTROLS (tick the appropriate boxes)
Time and temperature control to heating
Room thermostat and bammargorPremit/remmargorp le room thermostat
Load/weather mumitpOnoitasnepmoc start control
Time and temperature control to hot water Cylinder thermostat and noitanibmoCremit/remmargorp Boiler
Heating zone valves toNdettiF required
Hot water zone valves toNdettiF required
Thermostatic radiator val toNdettiFsev required
Automatic bypass to toNdettiFmetsys required
Boiler interlock Provided
Customer eT:eman lephone number:
Address:
Boiler make and model:
Boiler serial number:
Commissioned by (PRINT saG:)EMAN Safe register number:
Company eT:eman lephone number:
Company address:
Commissioning date:
This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating
compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.
Failure to install and commission according to the manufacturer’s instructions and complete this Benchmark Commissioning Checklist will invalidate the
warranty. This does not affect the customer’s statutory rights.
%RWKIOXHWHVWSRLQWSOXJVDUHLQSODFH
7KHIURQWFRYHULVFRUUHFWO\ILWWHGWKHVHFXULQJVFUHZVDUHIXOO\WLJKWHQHG
Warning
After servicing or performing any maintenance on the boiler
ensure that
14 Appendix
64

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Potterton Assure System Series and is the answer not in the manual?

Potterton Assure System Series Specifications

General IconGeneral
BrandPotterton
ModelAssure System Series
CategoryBoiler
LanguageEnglish

Related product manuals