Installation
01.4IB.67000
Figure 7 Installation Details for Indoor Power/Vac® Metal-Clad Switchgear (cont.)
2.12
FINISH FLOOR
LINE
4" CHANNEL
(SEE NOTE#2)
2
3
A
-ALTERNATE METHOD
BOLT
SWITCH GEAR PAD
1
A
B
A
FINISH FLOOR
1
MUST BE EVEN
AND LEVEL
FINISH FLOOR
1
MUST BE
EVEN AND
LEVEL
SEE NOTE#1
1
4" CHANNEL
SWITCH GEAR FLOOR STEEL
(SEE NOTE#2)
3
1
POWER VAC
FLOOR FRAME
2
66" REQUIRED AS
MINIMUM AISLE
SPACE FOR
BREAKER REMOVAL
FRONT
2.12
2- 0.75 DIA HOLE FOR
0.50 DIA ANCHOR BOLT
FRONT & REAR
2
35" RECOMMENDED
FOR REAR HINGED
COVERS
2
REAR
0.00
2
1
2
INDOOR ANCHORING METHOD
1" MAX
FINISH FLOOR LINE
VIEW-
B
-TYPICAL FOR CONDUIT LEADS
NOTE#1:
THE FINISHED FLOOR PAD MUST
PROJECT 66 INCHES BEYOND THE FRONT
OF THE P/V EQUIPMENT DEVICE
PANEL.THE ELEVATION MUST BE LEVEL
WITH THE BOTTOM OF P/V FLOOR FRAME
AND SWITCHGEAR PAD
NOTE#2: ALL FLOOR CHANNELS ARE
FURNISHED BY THE CUSTOMER
NOTE#3
THE FOUNDATION MUST BE FLAT AND
LEVEL IN ALL PLANES. PERPENDICULAR ON
BOTH AXIS TO WITHIN .25" OVER A 10' SPAN
82.00
OR
94.00
2
BOLT