Powered by Safety
®
21
Installation
01.4IB.67000
Figure 9 Installation Details for Outdoor Power/Vac® Metal-Clad Switchgear (cont.)
1" MAX.
FINISH FLOOR LINE
VIEW- B
-TYPICAL FOR CONDUIT LEADS
NOTE
#1. THE FINISHED FLOOR PAD MUST PROJECT
66 INCHES BEYOND THE FRONT OF THE P/V
EQUIPMENT DEVICE PANEL. THE ELEVATION MUST
BE LEVEL WITH THE BOTTOM OF P/V FLOOR
FRAME AND SWITCHGEAR PAD
#2. ALL FLOOR CHANNELS ARE FURNISHED BY
THE CUSTOMER.
NOTE
#3 THE FOUNDATION MUST BE FLAT AND
LEVEL IN ALL PLANES. PERPENDICULAR ON
BOTH AXIS TO WITHIN .25" OVER A 10' SPAN.
POWER-VAC EQUIP
DEVICE PANEL
BOLT
2.62
2
FINISH
FLOOR
PAD
1
2.00
4
THREADED INSERT IN CONCRETE
AA
SWITCHGEAR PAD
1
2.62
2
2.00
AB
ANCHOR
BOLT
4
POWER-VAC EQUIP
FLOOR FRAME
FINISH FLOOR
LINE
1
2
4" CHANNEL
SWITCHGEAR
FLOOR STEEL
(SEE NOTE 2)
A -
ALTERNATE ANCHORING METHODS
94.00
2
35" RECOMMENDED FOR
REAR HINGED COVERS.
B
A
SEE NOTE#1
FINISH FLOOR
PAD
1
2
3.00
ANCHORS
USE EXPANSION
BOLTS
0.00
1
3
1
2
3
2
FRONT
66" REQUIRED
AS MINIMUM
AISLE SPACE
FOR BREAKER
REMOVAL.
3.00
A
3.00
0.38
FINISH FLOOR PAD
2
2
2
1
SWITCH GEAR PAD
1
2.62
2
2
1
1-.75 DIA HOLE
FOR. 50 DIA ANCHOR
BOLT FRONT REAR
OUTDOOR ANCHORING METHOD.
REAR
1
5
POWER-VAC
FLOOR FRAME
1