iv
Powerware 9315 (500 kVA--750 kVA) T1 and T3 Installation Addendum
164201244--001 REV. A 011500
5 Installing Transformer T3 5---1.................................
5.1 Inspecting and Unpacking T3 5---1............................
5.2 Transformer T3 Installation 5---2...............................
5.2.1 Hardware Removal for Access to T3 Mounting Location 5---2.....
5.2.2 Installing T3 5---10...........................................
5.2.3 Reconnecting T3 Power Wiring 5---10...........................
5.2.4 Assembly and Hardware Reinstallation 5---13....................
6 Dielectric Testing 6---1........................................
6.1 Dielectric Test Procedure After Transformer Replacement 6---1....
6 . 2 E q u i p m e n t 6 --- 1.............................................
6.3 UUT Preparation 6---1.......................................
6.3.1 Single Module (RT) Preparation 6---1..........................
6.3.1.1 Installing UPS Internal Power and Control Wiring 6---1...........
6.3.1.2 Single Module (RT) Test Setup 6---3...........................
6.3.2 Multi-Module Preparation 6---5................................
6.3.2.1 Installing UPS Internal Power and Control Wiring 6---5...........
6.3.2.2 Multi---Module Test Setup 6---5................................
6 . 4 D i e l e c t r i c Te s t i n g 6 --- 7.......................................
6.4.1 Definitions 6---7.............................................
6.4.2 Testing 6---7................................................
6.5 Returning System to Normal 6---8.............................
6.5.1 Single Module (RT) 6---8.....................................
6.5.2 Mul ti-Module Installation 6---8.................................
7 Final Assembly 7---1..........................................
7.1 Output/Inverter Cabinet 7---1.................................
7.2 Input/Rectifier Cabinet 7---1..................................