13. Connect test jum p ers using the information contained in table 6---1.
Table 6---1. Single Module (RT) Test Jumper Installation
Number of
Wires
From To
1 E1 E2
1 E2 E3
1 E3 E4
1 E4 E5
1 E5 A_Rect_E1
1 A_Rect_E1 A_Rect_E2
1 A_Rect_E2 A_Rect_E3
1 A_Rect_E3 B_Rect_E1
1 B_Rect_E1 B_Rect_E2
1 B_Rect_E2 B_Rect_E3
1 E5 Input_Filter_E2
1 Input_Filter_E2 Input_Filter_E4
1 Input_Filter_E4 Input_Filter_E6
1 A6_INVERTER_DC+
A6_INVERTER_C
1
A6_INVERTER_C
E9
1 E9 E10
1 E10 E11
1 E11 E12
14. If installed, manually close CB1.
15. If installed, manually close CB3.
16. Install static switch in MBC cabinet.
17. Manually close CBP.