6-- 9
Powerware 9315 (500 kVA--750 kVA) T1 and T3 Installation Addendum
164201244--001 REV. A 011500
6. Connect Inverter Control (IGBT) PCB 2 connectors J9, J11, J12, J13, J14, J15,
and J16.
7. Connect Inverter Control (IGBT) PCB 3 connectors J9, J11, J12, J13, J14, J15,
and J16.
8. Connect Power Supply 1 connector J1.
9. Connect Power Supply 2 connector J1.
10. Connect Machine Controller PCB connector J2.
11. Open all circuit breakers.
12. Proceed to Chapter 7 Final Assembly of this manual.