EasyManua.ls Logo

PRECISION DIGITAL PD603 - SETUP AND PROGRAMMING

PRECISION DIGITAL PD603
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Sabre P Model PD603 Process Meter Instruction Manual
14
SETUP AND PROGRAMMING
There is no need to recalibrate the meter
when first received from the factory.
The meter is factory calibrated prior to
shipment, for all input types, in milliamps and
volts. The calibration equipment is certified to
NIST standards.
Overview
There are no jumpers involved in the setup process of the meter. The
switch, located between the SIGNAL and the RJ11 connectors is not
used with the PD603 model. Setup and programming is done through
the front panel buttons.
After power and signal connections have been completed and verified,
apply power to the meter.
For
Quick User Interface Reference Guide
go to page 31

Related product manuals