Mark holes for drilling on the left in the battery box.
Drill holes Ø8,5mm and mount computer bracket with supplied plugs.
Before mounting back battery holder, remove lip. Before mounting air filter housing, battery (box) and
VSI2 ECU, connect VSI2 wiring to petrol ECU and push switch wiring through grommet.