Ball Return Installation Manual
To install the base, measure
side plate of the ball lift
and draw a line perpendicular to the centerline. Mark 5
either side of the centerline o
n the line, and drill 5/16
inch pilot holes at the two
130) over the cutout so the centerline of the base aligns
with the centerline you drew on the approach
Ensure the base is parallel to the Ball Lift and secure th
e base to the approach using
Mark the locations for the back holes, and drill 5/16
door at the marked locations.
The hood is secured to the base by tabs on the base that snap into slots on the
hood. The hood is attached to the access panel which, in turn, is held in place by a
way bracket that connects the ball rack, ball lift, and hood to
after the Control Box and ball rack are installed to complete the hood installation.
installed inside the base.
install the control box, remove the screws
of the control box and remove the
and fasten it with the four screws (809
Connect the cables to the control box as indicated
ng inside the control box cover.