EasyManua.ls Logo

QubicaAMF Options Ball Return User Manual

Default Icon
46 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
BALL RETURN
With Optional Lower Rack
Installation, Operation,
Service,
and Parts Manual
Revised:
10/30
/2007
P/N: 612
860
010 Rev
F
Copy
right ©
2006
Qubica
AMF Bowling Products, Inc., 8100 AMF Drive, Mechanicsville, Virginia 23111
Qubica
AMF Bowling Products, Inc.,
Technical Support
(International) 804 730
-
4000
(Domestic) 1
-
866
-
460
-
7253
Question and Answer IconNeed help?

Do you have a question about the QubicaAMF Options Ball Return and is the answer not in the manual?

QubicaAMF Options Ball Return Specifications

General IconGeneral
BrandQubicaAMF
ModelOptions Ball Return
CategorySports & Outdoors
LanguageEnglish

Summary

Introduction and Manual Overview

How To Use This Manual

Provides guidance on how to effectively use the manual for the Options Ball Return.

Packing Lists and Tools

Lists included parts and necessary tools for installing the Options Ball Return.

Installation Procedures

Hand Guard Kit Installation

Instructions for installing the Hand Guard Kit for enhanced safety.

Options Ball Lift Installation

Details the process of installing the main Ball Lift component onto the approach.

Approach Opening and Lift Installation

Guides on cutting the approach opening and installing the Ball Lift, with layout dimensions.

Installing the Ball Stop

Instructions for mounting the ball stop mechanism to prevent backward ball movement.

Installing the Hood Assembly

Steps for assembling and installing the hood to protect the Ball Lift mechanism.

Base and Control Box Installation

Procedures for positioning and securing the base and installing the control box.

Ball Rack and Lower Rack Installation

Instructions for assembling and attaching the ball rack and optional lower rack.

Front Cover Installation

Steps for attaching the front cover, connecting the ball rack, ball lift, and hood.

Connecting the Wiring

Comprehensive guide on wiring the Ball Lift, control box, and associated components.

Setup and Testing

Initial Power-Up and Safety Switch Test

Procedures for turning on power, verifying initial beeps, and testing the Ball Lift's safety switch.

System Verification and Mode Reset

Verifying ball rack transitions, pinspotter cycling, blower function, and resetting modes.

Operation and Safety

Operational Safety Precautions

Critical safety warnings regarding moving parts and hazards during operation.

Ball Lift Control Modes

Explains Normal, Forced-ON, Forced-OFF, and EMERGENCY operating modes.

Ball Rack and Blower Features

Describes the ball rack design for staggering balls and the integrated blower operation.

Service and Maintenance

Routine Inspection and Cleaning Schedule

Outlines weekly maintenance tasks including cleaning and basic checks.

Periodic Component Checks and Adjustments

Details quarterly inspections of wear items and component adjustments.

Parts Identification and Diagrams

Ball Lift Assembly Diagram

Exploded view diagram of the main Ball Lift assembly components.

Major Assemblies and Parts Lists

Parts for key assemblies like Control Box, Hood, and Ball Racks.

Specific Component Diagrams

Diagrams and parts for specific components like power cable, shafts, and clutch.

Ball Rack Specifics and Lower Rack Assembly

Diagrams for ball racks and lists for 11-ball, 15-ball, and lower rack assemblies.

Ball Stop and Other Component Parts

Diagram and parts list for the underlane return ball stop.

Related product manuals