Ball Return Installation Manual
This manual contains info
rmation needed to properly install, operate, and maintain the
Options Ball Return. If any terms, concepts, or operations contained in this manual are
not clear to you, consult an experienced professional or
ore you begin the installation, check your shipment against the packing list to ensure
that all parts have been included. Report missing items to
between the hours of 8:00 a.m. and 5:00 p.m. Eastern Time. After 5:00 p.m., you
n leave a message on the voice mail system. The 24
When you see this symbol associated with an
a possible hazard is indicated. Follow these
Before installing, removing, or replacing electronic
equipment, be certain that the supply power to the
unit has been turned OFF at the main circuit
Verify that the power source matches that required
load rating is 10 amps for
volt units and 5 amps for 220
circuit breaker should be sized according to
applicable local and regional codes.
Protect the approach and lane surfaces before you
begin installation of the Ball Return unit.
Before applying power to a Ball Return, be sure that all cables have been
especially the main power cables.
Before operating a Ball Return, be sure that all GUARDS are in place.