Ball Return Installation Manual
To silence the audible alarm, SIMULTANEOUSLY press all three push buttons on the
end of the ball rack. The Ball Lift will beep at 30
second intervals as a reminder that the
Ball Lift is not in the NORMAL Mode.
e Ball Lift to normal operation, verify that the outlet opening has been
wheel guard, and then SIMULTANEOUSLY press both of the 10
*Push buttons must be pressed simultaneously;
otherwise, the normal function of the button will
To Return to Normal Operation
To Silence Alarm: Press 1, 2, & 3*
To Return to Normal: Press 1 & 3*
The ball rack is designed to stagger the balls as they return, first to the left, or odd, lane
and then to the right, or even, lane. This arrang
ement allows more bowling balls to be
accommodated on the rack when compared to a single, straight
allowing easy access from either side of the rack. This is accomplished by having the
ball exit the Ball Lift on the center two rail
s of the ball rack and then deflecting the ball to
the left set of rails when it touches the semicircular deflector that is molded into the
blower housing at the end of the rack. Subsequent balls are deflected to the opposite
side of the rack when they co
ntact an existing ball since contact is made “off center” due
to the position of the existing ball. The rails have a slight downward slope to help
maintain the momentum of the ball and assure adequate deflection energy. There are
main ball rack for the storage of additional bowling balls.
There is also a blower built into the end of the ball rack that operates continuously when
the Ball Lift is in operation.