Ball Return Installation Manual
Turn off the pinspotters and wait for the Ball Lift to turn off.
delay of 30 seconds before
the Ball Lift turns off. This allows any bowling
balls in the system to return through the Ball Lift to the ball rack.
The Ball Lift can be placed in a “Forced
ON” condition allowing the Ball Lift to
operate even when both pinspotters are off. To place
the Ball Lift in the “Forced
condition, SIMULTANEOUSLY press the mechanic call button and the ODD
frame push button on the end of the ball rack. The Ball Lift’s speaker
will emit a single beep and the ball lift will start. The speaker wi
30 seconds as a reminder that the Ball Lift is not in the NORMAL Mode.
To return the Ball Lift to normal from a “Forced
ON” condition, SIMULTANEOUSLY
frame push buttons on the end of the ball rack. The Ball Lift
Turn on the pinspotters and return a few balls through the Ball Lift. Adjust the
transition brackets, as needed, to obtain a smooth transfer of the ball to the ball
frame (cycle) push button on the ball rack and ver
corresponding pinspotter cycles properly.
Verify that the blower is functioning properly (The blower turns on and off together
with the Ball Lift motor).
Press the mechanic call button and verify a signal is received at the back of the
tter. If pit signal kit is installed, light will come on. If the new XLi chassis are
used in the center, stack light will alternately flash green and red.
Install the hood and access cover assembly. When these tests are satisfactory, the