Pump pressure adjustment valve
The machine is delivered with the valve set at 10 Bar. The end user can adjust
the valve (s) to increase or decrease the pressure.
1. Release the filter holder from the group.
2. Remove the filter from the filter-holder.
3. Insert the blind filter in the filter-holder.
4. Attach the filter holder to the coffee brew group.
5. Start the coffee brew group delivery using the delivery lever to obtain the
maximum pressure in the circuit, shown on the gauge.
6. Remove the cap to have access to the adjustment screw (s).
7. Act on the valve adjustment screw, turning it clockwise to increase the
pressure and anticlockwise to decrease the pressure in the circuit.
8. Stop the delivery.
9. Start delivery of the group and check the pressure adjustment shown on the
gauge.
10. Repeat the above operations until the required adjustment is achieved.
- +
Valve adjustment screw
It is advised to adjust the pressure within a maximum of 12 and a minimum of 9
Bar.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Quick MILL ELEVATE R and is the answer not in the manual?

Quick MILL ELEVATE R Specifications

General IconGeneral
BrandQuick MILL
ModelELEVATE R
CategoryCoffee Maker
LanguageEnglish

Related product manuals