10 | iProductionManager
62 / 112 Operating instructions
3. Assign a name.
4. To confirm the action, press the button:
>> The planning is displayed in the planning list.
10.7.2 Start planning
a You have created a planning [}61].
a The iProductionManager is not currently processing any tickets. When tickets are processed, a message
appears, informing you that all tickets must be cancelled before planning starts.
1. Press the button
2. Press the desired planning.
>> The planning starts immediately. The tickets are placed on the racks according to the planning. The tickets on
the ticket board are replaced by the tickets included in the planning.