32DF9T02.C
ii
Revision Record
REV DATE PAGES DESCRIPTION OF CHANGE ECR/ECO
07/08/03 3-9 - 3-12 Redrew physical outline of Lifting Frame
12/04/03 5-24 Added item 20C
12/17/03 5-15 Added item 10
01/30/04 3-6 Added Troubleshooting Table
06/22/04 5-9 Added item 21
06/30/04 5-24 Changed item 12 from 19583, item 29 from UV-SP-001 TO 20123.
Changed items 5 & 8 to bags of 10.
07/20/04 5-11 Changed item 1 from 20617 to 22247; item 18 from 20629 to
22245, item 10 from 20623 to 22238, item 13 from 25386 to 19576.
Changed items 17-1, 17-2 & 17-3 to bags of 10. Added item 19
(22245), 17-3 (29851.
07/26/04 5-5 Changed item 2A, 8, & 12. Added items 4B, 4C, 7B, 7C, 18A, 18B,
18C, 19, 20, 21, 22, 23.
5-13 Changed item 1A from 16064 to 22530. Added items 11B, 11C,
12A, 12B, & 12C.
32DF9T02.
C
07/29/04
5-21 Added item 1B
5304
NOTE: Determine whether revisions made to this manual will impact the F9T Equipment Installation Verification
checklist (32EIVF9T). Revise the EIV, as necessary.