21
20063732
Start-up, calibration and operation of the burner
6.1 Notes on safety for the first start-up
6.2 Adjustments prior to ignition
Check the adjustment of the head as shown in pag. 15.
Check the adjustment of the air damper as shown in
pag. 15.
Slowly open the manual valves situated upstream from the
gas train.
Adjust the air pressure switch (Fig. 19) to the start of the
scale.
Purge the air from the gas line.
We recommend using a plastic tube routed outside the build-
ing and to purge air until gas is smelt.
6.3 Combustion adjustment
In conformity with EN 676 the application of the burner on the
boiler, adjustment and testing must be carried out observing the
instruction manual of the boiler, including verification of the CO
and CO2 concentration in the flue gases, their temperatures and
the average temperature of the water in the boiler.
It is advisable to set the burner according to the type of gas used
and following the indications in Tab. F.
Tab. F
6 Start-up, calibration and operation of the burner
The first start-up of the burner must be carried out
by qualified personnel, as indicated in this manual
and in compliance with the standards and regula-
tions of the laws in force.
Check the correct working of the adjustment, com-
mand and safety devices.
Refer to paragraph “Safety test - with gas ball
valve closed” on page 24 before the first start-
up.
Before starting up the burner, it is good practice to
adjust the gas train so that ignition takes place in
conditions of maximum safety, i.e. with gas deliv-
ery at the minimum.
EN 676 Air excess: max. output. 1.2 – min. output 1.3
GAS
Theoretical
max CO2
0 % O2
Setting CO2 %
CO
mg/kWh
NOx
mg/kWh
= 1.2 = 1.3
G 20 11.7 9.7 9.0 100 170
G 25 11.5 9.5 8.8 100 170
G 30 14.0 11.6 10.7 100 230
G 31 13.7 11.4 10.5 100 230