EasyManua.ls Logo

Riello MULTI SENTRY MST 80 - FIRST START-UP AND ADDITIONAL SETTINGS

Riello MULTI SENTRY MST 80
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FIRST START-UP AND ADDITIONAL SETTINGS
ATTENTION: the QN switch is for Service personnel use only and must remain closed with its safety lock.
Only the following switches can be handled: SWIN, SWBYP (if present), SWOUT, external UPS battery line
switch and, necessary, SWMB (see paragraph “Manual bypass (SWMB)”)
Visual connection inspection
Check that all connections have carefully been made according to the paragraph "Electrical connections."
Check that all switches are open (except for the QN switch, locked in the closed position).
Closing the external UPS battery line switch/fuses
After having checked proper connection polarity, close the external UPS battery line switch/fuses
Attention: any connection made not in compliance with instructions stated in paragraph "Electrical
connections" may have damaged the battery fuses and other protections; in this case, call for assistance
to avoid further damage to the UPS.
UPS Power
Close protections upstream to the UPS.
Closing the SWMB Manual bypass switch
Close the SWMB manual bypass switch and check that output voltage is present.
Re-open the SWMB switch.
Closing input switches
Close the SWIN and SWBYP input switches (if present).
MST 60-80
MST 100
MST 125

Table of Contents

Related product manuals