13 INITIAL STARTUP
13.1 Initial Startup Requirements
Installation must be complete prior to the required factory authorized initial startup. The factory authorized startup
must be complete prior to placing the boiler into service. Starting the boiler without proper piping, combustion air,
venting or electrical connections or control settings can be dangerous and may void the product warranty. The
following startup instructions must be followed precisely in order to achieve safe and efficient operation to assure
trouble-free service life.
WARNING: Proper startup must be made by a qualified installer or service agency, who must read and follow
the supplied instructions and appliance markings. Failure to complete proper startup before use, tampering
with controls or not following all instructions and markings may damage this equipment, void the warranty
and may result in property damage, personal injury or death.
A Start-up Form is included with each product and must be completed by the qualified installer or service agency
conducting the startup and must be returned to the manufacturer to register the warranty. Copies are available at
www.riversidehydronics.com.
WARNING: Turn off all power to the boiler when servicing or accessing the blower drive. The blower drive
still has power when appliance switch is off. Failure to turn off all power to the boiler can cause personal
injury, property damage or death.
13.2 Tools and Instrumentation Required
Stack Temperature Gauge
Stack Draft Gauge
Electronic Combustion Analyzer
Two U-tube Manometers or pressure gauges
AC/DC Multi-meter (with 20,000 OHM/Volt rating)
Amp Meter
Normal Hand Tools
13.3 Resources
Product Installation & Maintenance Manuals
Start-up Report with instructions
Local, State, & Federal Codes
Toll Free 24-Hour Technical Support: 1-800-433-5654
13.4 On Site Considerations
Electrical Supply in accordance with Nameplate Rating
Uncontaminated Combustion Air
Adequate Fuel Supply
Treated Water Supply (Boilers)
13.5 Startup Procedure
1. Carefully study the burner start-up information included in this manual.
2. Fill system tank with water:
a. Close the drain valve
b. Open the pressure relief valve or other air vent valve (if equipped) located above the tank to permit the air in
the system to escape.
c. Open the makeup water fill valve.
d. Close the pressure relief valve or other air vent valve opened in step b, when water starts for flow from the
valve.
e. If venting through the pressure relief valve was used when filling the boiler, ensure the relief valve has been
returned to the proper operating condition prior to start-up