(2)
Attach
the engine base to the bottom
of
the engine. (See Fig.
10-37.)
8
@
x
50
mm flange bolt
. .
.4
pcs.
8
@
nut
.
.
.4
pcs.
NOTE
:
Insert the bolts from he bottom side of the engine base.
120
-
140
kgcm
8.7
-
10.1
ft-lb
Engine mount
rubbers
-
Engine
mount
holes
Fig.
10-37
(3)
Mount the generator base on the alternator mount rubber and fix with the nut.
8
@
nut.
.
.
1
pce.
NOTE
:
Set the generator base
so
that the column
of
the frame
is
placed
in
the center of the pipe
on
the bottom of the generator base.
11.8
-
13.7
N-m
120
-
140 kg-m
8.7
-
10.1
ft-lb
(4)
Install the engine and alternator assembly into
a) Lift the engine and alternator assembly with a
chain block, and down
it
into the frame, mak-
ing sure that the bolts of the mount rubbers are
correctly inserted into the engine base.
b)
Fix
the
engine and a alternator assembly to the
mount rubbers. lighten the
two
nuts at engine
base
and
two
bolts at generator base.
10
@
nut..
-2
pcs.
the frame.
Tightening torque
I
235
-
29.4
N-m
240
-
300
kgcm
17.4
-
21.7
ft-lb
L
I
I
Make
this
gap
even.
Fig.
10-38
Fig.
70-39
-
44-