R&S FSP Module Replacement
1164.4556.82 3.23 E-1
Installing the New LCD and DC/AC Converter and Completing the Instrument
Install the new LCD or new DC/AC converter in reverse order, fasten all screws, and connect and
mount the corresponding cables.
When mounting the display cable (947), make sure it is free of mechanical stress.
Observe the following order when installing parts:
1) Before installing the display, connect the display cable (947) to the adapter board. You must hear
the connection engage.
2) Reattach the display (920) with four screws (930).
3) Mount the display cable (947) with 2 screws (950), making sure it is free of mechanical stress.
Place the front panel with the keys on the top of the instrument, with the cables in the right direction
to the front module controller.
Carefully plug the cable connectors to the controller board without reversing the polarities and
replace the mounting plate in the reverse order.
Fig. 3-10 Position of connectors on front module controller
Rotate the front panel into the instrument and screw with four countersunk screws (610) in the front
frame at the top and at the bottom.
CAUTION
Make sure to route the cables properly.
Install the labelling panel (270).
Push the 2 front handles (420) on the instrument and mount them with the 4 screws (430).
Replace the volume control knob (Option R&S FSP-B3), if it was removed.
Connect the instrument to the mains, switch on the instrument power switch and switch on the
instrument with the ON/STANDBY key