Reference Manual
00809-0100-4792, Rev CA
August 2010
3-5
Rosemount 1495, 1496
SAFETY MESSAGES Instructions and procedures in this section may require special precautions to
ensure the safety of the personnel performing the operations. Please refer to
the following safety messages before performing any operation in this section.
INSTALLATION
INSTRUCTIONS
Step 1: Determine the
Proper Placement
Determine the proper placement by ensuring adequate straight run. See
Appendix B: Recommended Installation Requirements.
Step 2: Determine the
Proper Orientation
To determine the proper orientation, see “Installation Configuration” on
page 2-2.
Step 3: Weld the Flange
Union
To weld the flange union, see “Step 3: Weld the Flange Union” on page 4-2.
Failure to follow these installation guidelines could result in death or serious injury:
* Make sure only qualified personnel perform the installation.
Personal hazard! To prevent injury, remove pressure and drain pipe assembly before
installing or removing orifice plate.
If the process fluid is caustic or otherwise hazardous, the procedure outlined here must be
modified as required to prevent death or serious injury to personnel.