18. Insert the shaft sleeve inside the column bushing.
Figure 8.18 Inserting the shaft sleeve inside the column bushing.
19. Place the bushing carrier assembly on top of the column pipe.
Figure 8.19 Placing the bushing carrier assembly on the top of the column pipe.