EasyManuals Logo

Ruijie RG-ES209GC-P User Manual

Ruijie RG-ES209GC-P
37 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #20 background imageLoading...
Page #20 background image
RG-ES206GS-P Series Switches Hardware Installation and Reference Guide Installing the switch
17
3.4 Verifying Installation
Caution
Turn off the power to avoid personal injury and damage to components caused by incorrect connection.
Verify that the ground wire is connected.
Verify that the Ethernet cables and power cords are properly connected.
Verify that the cables with a distance of 100 meters (328.08 feet) are managed indoors. If not, check whether
the power supply and interfaces are protected from lightning strikes.
Verify that there is a minimum clearance of 100 mm (3.94 in.) around the switch.

Other manuals for Ruijie RG-ES209GC-P

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ruijie RG-ES209GC-P and is the answer not in the manual?

Ruijie RG-ES209GC-P Specifications

General IconGeneral
BrandRuijie
ModelRG-ES209GC-P
CategorySwitch
LanguageEnglish

Related product manuals