EB 8091 EN 5-7
Installation
Î Check the travel reading at the travel in-
dicator scale.
5.4.3 Fail-safe position
Î Shut off the signal pressure line.
Î Check whether the valve moves to the
fail-safe position (see the 'Design and
principle of operation' section).
5.4.4 Pressure test
The plant operator is responsible for per-
forming the pressure test.
Our after-sales service can support you to
plan and perform a pressure test for your
plant.
During the pressure test, make sure the fol-
lowing conditions are met:
− Retract the plug stem to open the valve.
− Observe the maximum permissible pres-
sure for both the valve and plant.
Tip