EasyManua.ls Logo

SARK 110 - Page 81

SARK 110
87 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SARK
SARKSARK
SARK-
--
-110
110110
110
User’s Manual
Rev 1.2.6 October 3
rd
, 2015 - 81 - © Melchor Varela – EA4FRB 2011-2015
The calibration procedure is as follows:
Connect the short load.
Load status is indicated by the color of the
voltage and current detector indicators.
Green denotes a load good status.
Press the appropriate button to continue, or
to exit.
The calibration progress will be shown in
the display bar.
The calibration is completed.
The calibration coefficients are shown at
the bottom of the screen, for information.
Press the appropiate button to apply the
new calibration settings, or to cancel them.
Press the appropiate button to go to the
optional Detector Test, or to exit.