EasyManua.ls Logo

Sartorius M-prove Series - Getting Started; Equipment Supplied; Storage; Location Installation Guidelines

Sartorius M-prove Series
105 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Equipment Supplied
Balance with protective flip-down cover
Weighing pan
Plug-in AC adapter
Additional equipment with models AY612, AY412,
AY212, AY711, AY511:
Calibration weight
Additional equipment with models AY303, AY123:
Calibration weight
Round glass draft shield
Level indicator and adjustable feet
Storage
$ Do not stack more than 3 balances on top of one
another at a time.
Installation
Choose a location that is not subject to the
following negative influences:
Heat (heater or direct sunlight)
Drafts from open windows and doors
Extreme vibrations during weighing
Excessive moisture
Setting Up the Balance
§ Place the components on the balance in the
following order:
Reversible round weighing pan
Round glass draft shield on models AY303, AY123
!Do not use as an “in-use“ cover!
4
4
Getting Started
PK Elektronik Vertriebs GmbH, E-Mail: info@pkelektronik.com, Internet: www.pkelektronik.com

Table of Contents

Related product manuals