EasyManuals Logo

Scania D11 User Manual

Scania D11
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #34 background imageLoading...
Page #34 background image
34 © Scania Industrial & Marine Engines 1997-11:2
23. Daily:
LOOK FOR LEAKAGE,
REMEDY AS NECESSARY
- Start the engine.
- Look for leakage of oil, coolant, fuel, air and exhaust.
- Tighten or change leaking connections. Check the overflow holes (1)
which show whether the O-rings between the cylinder liner and crank-
case are leaking, see drawing.
a) If coolant is leaking out, the two upper O-rings are leaking.
b) If oil is leaking out, the lower O-ring is leaking.
- Check that the drain hole (2) on the coolant pump is not blocked, see
drawing. If there is leakage, change the pump seal.
A small amount of leakage from the overflow holes when running in the
engine is normal. (Seals and O-rings are fitted lubricated with soap or
oil).
This leakage normally stops after a time.
If there is a large amount of leakage - contact your nearest Scania
workshop.
1
1 1 1
1
1
2

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Scania D11 and is the answer not in the manual?

Scania D11 Specifications

General IconGeneral
BrandScania
ModelD11
CategoryEngine
LanguageEnglish

Related product manuals