EasyManua.ls Logo

Scania DI13 - Engine Starting and Running

Scania DI13
97 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPM 250 en-GB 19
© Scania CV AB 2022, Sweden
Starting and running
Starting and running
Checks before first start
Before the engine is started for the first time, car-
ry out the maintenance items listed under First
start in the maintenance schedule. Check the fol-
lowing (also see Maintenance interval
):
Oil level.
Coolant.
Fuel level.
Fluid level in batteries.
State of battery charge.
Condition of the drive belt.
Reductant tank
The illustration shows the component parts of
the reductant tank (buffer tank). You can access
the reductant pump in the tank by opening the in-
spection hatch (4) on the right-hand side of the
tank.
Reductant volume:
Total volume: 30 litres (7.9 US gallons).
Filling volume: 16 litres (4.2 US gallons).
1
6
3
5
4
2
388 133
Reductant tank.
1. Reductant pick-up unit.
2. Reductant pump.
3. EEC3 control unit.
4. Inspection hatch.
5. Drain plug.
6. Reductant tank.

Table of Contents

Other manuals for Scania DI13

Related product manuals