Cooling system
OPM 360 en-GB 40
© Scania CV AB 2017, Sweden
Checking sacrificial anodes
1. Drain the sea water circuit. See the section
Draining the sea water circuit
.
2. Check the sacrificial anodes and scrape off
all loose material from them.
3. Renew the sacrificial anode if less than half
of it is left. A new sacrificial anode is 60 mm
long with a diameter of 17 mm.
4. Renew the gasket when fitting.
5. If the sacrificial anodes are very corroded,
the inspection intervals must be reduced.
Checking the sea water pump
impeller
1. Drain the sea water circuit. See the section
Draining the sea water circuit
.
2. Check that the vanes of the impeller are not
heavily splintered or damaged.