EasyManuals Logo

Scania DI16 XPI series User Manual

Scania DI16 XPI series
83 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #71 background imageLoading...
Page #71 background image
Miscellaneous
OPM 360 en-GB 71
© Scania CV AB 2017, Sweden
Checking and adjusting the
valve clearance
Special tool
WARNING!
Block the starting device. If the engine starts un-
expectedly, there is a serious risk of injury.
IMPORTANT!
The engine must be cold when the work is car-
ried out.
Remember to remove the turning tool from the
flywheel after adjustment.
Note:
Carry out the working without pausing, so that
no step is overlooked.
Carry out a check and adjustment of the valve
clearances one more time after the first 500 hours
of operation. After this, adjustment according to
the regular interval takes place, which is every
2,000 operational hours.
Number Designation Illustration
99 309 Turning tool for rotating the flywheel from below
99 109 Turning tool for rotating the flywheel from above
Other tools
Torque wrench 0-50 Nm
Waterproof felt-tip pen
0.45 and 0.70 mm feeler gauges
Flash light
Mirror
142 238
312 733

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Scania DI16 XPI series and is the answer not in the manual?

Scania DI16 XPI series Specifications

General IconGeneral
BrandScania
ModelDI16 XPI series
CategoryEngine
LanguageEnglish

Related product manuals