C
Casey RobertsNov 27, 2025
How to improve opening and closing times for SCHUNK PZN-plus 40?
- MMolly AndersonNov 27, 2025
To improve the opening and closing times for your SCHUNK Industrial Equipment, consider the following: * Ensure compressed air lines are optimally installed. If present, open the flow control couplings on the product to the maximum extent that the movement of the jaws occurs without bouncing and hitting. * Check compressed air lines. * Ensure inner diameters of compressed air lines are of sufficient size in relation to compressed air consumption. * Keep compressed air lines between the product and directional control valve as short as possible. * Ensure the flow rate of the valve is sufficiently large relative to the compressed air consumption. * Do not remove the throttle check valve, even if the product has not reached the opening and closing times. * Check the permissible...












