Page 2
TABLE OF CONTENTS
SECTION DESCRIPTION PAGE #
1.0 INTRODUCTION 4
2.0 SAFETY PRECAUTIONS 5
2.1 WARRANTY 7
3.0 WARNING LABELS 8-9
4.0 INSTALLATION & SET-UP 10-19
4.1 Physical Dimensions 11
4.2 Machine Moving Procedures 12
4.3 Physical Inspections 13
4.4 Electrical Requirements 14
4.5 Machine Start Up 17
4.6 Machine Stroke Inspection & Adjustment 18
5.0 MAINTENANCE 20-23
5.1 Lubrication 20
5.2 Routine Lubrication 20
5.3 Scheduled Maintenance 22
6.0 MACHINE OPERATION 24-35
6.1 Punch Operation 24
6.1B Stripper Adjustment 29
6.2 Bar Shear Operation 30
6.2A Shear Arm Adjustment (Ser. # 7815 & Up) 32
6.2B Shear Blade Adjustment (Ser. # 7815 & Up) 34
7.0 OPTIONAL TOOL OPERATION 36-61
7.1 6 x 6 Angle Shear 38
7.2 Rod Shear 40
7.3 6 x 6 Ninety Degree Notcher 42
7.4 Rectangle Notcher 44
7.5 12 & 24 Inch Brakes 46
7.6 Angle Iron Brake 48
7.7 Channel Shear 50
7.8 Pipe Notcher 52
7.9 Picket Tool 55
7.10 Square Tube Shear 56