Universal Radiographic System
Service Manual
SM-0524R4
1
SECTION 1 INTRODUCTION
1.1 TOOLS
The following hand tools are required for the Installation:
Standard service engineers tool kit.
Electric drill motor and assorted bits.
1.2 PRE-INSTALLATION CHECKS
Prior to beginning installation it is recommended to inspect the site and verify
that the X-ray room complies with requirements such as:
Space Requirements to allow installation and system movements must
consider the maximum dimensions and travels of the equipment.
Maximum Height 2720 mm
Maximum Width 2260 mm
Maximum Length 1400 mm
Conduits and walls are ready to install the system.
Electricity installation:
Main Supply: Single phase, 50 / 60 Hz
115 / 208 / 230 / 240 V~
Minimum power input required: 400 VA
ACCORDING TO THE MDD/93/42/EEC, THIS UNIT IS
EQUIPPED WIT H EMC FILTERS. THE LACK OF THE
PROPER GROUNDING MAY PRODUCE ELECTRICAL
SHOCK TO THE USER.