SOHO Power Supply
22
5. Commissioning
The commissioning follows as below flowchart.
Start Commissioning
Wiring Check
N.G
OK
Disconnect Load
Start Engine
Input Volts > 260Vac
Stop Engine
N
Y
Turn-on MCCB
PS Running?
PS : Power Supply(Power Converter)
Turn-off MCCBN
Fuse Checking
Wiring Checking
Connection of SOHO
Drive Manager
Y
Comm. Cable CheckingCommunication OK?
Port Setting Checking
N
Y
A
Parameter Initialization