Installation Instructions Section 2
2-4
Part Number 020003997 4/12
Pre-installation Checklist
When installing any system, first make sure the major components are available. Generally the major components
necessary for an installation are:
ESSENTIAL TOOLS
- Tubing Cutters
- Oetiker pliers
- Phillips and slotted screwdriver
- Power drill
- Six (6) inch adjustable wrench
- Tape Measure
Pre-mix System:
B-I-B System also:
Post Mix System:
Bulk Syrup System also:
Double Check:
LOCATIONS OF THE FOLLOWING:
CO
2
regulator set
Product connectors for Figal tank
Gas connectors for Figal tank
Beverage dispenser
Beverage tubing
CO
2
tank
Figal beverage tanks
Stepless (Oetiker) clamps
Chain for CO
2
tank
B-I-B connectors
B-I-B regulator set
B-I-B rack
B-I-B syrup boxes
CO
2
regulator set
Beverage dispenser
Beverage tubing
CO
2
tank
Carbonator
Stepless (Oetiker) clamps
Chain for CO
2
tank
Syrup connectors for Bulk tank
Gas connectors for Bulk tank
Bulk syrup tanks
Do you have enough space to install the
dispenser or a dispenser and top mounted ice
machine?
Does top mounted ice machine (if utilized) have
a minimum of 6 inches (15.3 cm) clearance on
all sides?
Is the countertop level?
Can the countertop support the weight of the
dispenser, or the dispenser/ice machine
combination plus the weight of the stored ice?
Water line
Drain
Power outlet
Heating and air conditioning ducts