15 | Page
INSTALLATION
INSTALLATION PROCEDURE CHECKLIST
For installing the unit in a new workspace location.
Pre-Installation
Verify a CO
2
gas supply source suitable for your application is
available and can be connected to the incubator, page
9.
Check that the required ambient conditions for the unit are met,
page
16.
Check that the spacing clearance requirements are met, page 16.
• Unit dimensions may be found on page 57.
Check that a suitable electrical outlet and power supply is present,
page
17.
Install the incubator in a suitable location
Review the lifting and handling instructions, page 18.
Install the unit leveling feet, page 18.
Install the incubator in its workspace location, page 19.
Set up the incubator for use
Clean and disinfect the unit and accessories (except the HEPA
filter), page
19.
Install the chamber HEPA filter and ceiling air duct in the
incubation chamber, page
20.
Install the shelving, page 21.
Connect the incubator to the CO
2
gas supply source, page 22.
Verify that the silicone stopper is installed in the access port
inside the incubation chamber, page
23.
Fill the water jacket with 19 gallons (72 liters) of water, page 23.