2Installation manual – NewMotion Business Pro & Lite 2.1 / 2.2 - 091NMEN13
Table of content
1. Preface 3
1.1. Original instructions 3
1.2. Copyright 3
1.3. Disclaimer of liability 3
1.4. About this document 3
1.5. Used symbols in this document 3
1.6. Used abbreviations / terminology in this document 3
2. Safety 5
2.1. Introduction 5
2.2. Intended use and reasonably foreseeable misuse 5
2.3. Qualication of installer 5
2.4. Protective measures 5
2.4.1. Personal protective equipment (PPE) 5
2.5. Residual risks 6
2.6. How to handle in case of an emergency 6
2.7. Safety precautions 6
2.7.1. Electricity 6
2.8. Labels 6
3. Description of the product 7
3.1. Main parts 7
3.2. Internal connections 7
3.2.1. Internal connections for tethered cable 8
3.3. Technical specications 8
3.4. Smart Charging services 9
3.4.1. Phase rotation 9
3.4.2. Dynamic Power Sharing 10
3.4.3. Dynamic Power Management for Business 10
3.5. Creating a project plan 11
3.6. Nameplate / markings 12
4. Transport and storage 12
4.1. Transport 12
4.2. Storage 12
5. Installation 13
5.1. Scope of delivery/Check the contents 13
5.1.1. Business Pro & Lite 2.1 / 2.2 13
5.1.2. Optional 13
5.2. Installation materials (not provided) 14
5.2.1. Power cable 14
5.2.2. Data cable (optional) 14
5.2.3. Earthing 14
5.2.4. Required nominal input voltage at charge point 14
5.2.5. Electrical protection 14
5.2.6. Charge point mounting 15
5.2.7. Installation tools and materials 15
5.3. Preparation 16
5.4. Mounting 17
5.4.1. Wall mount 18
5.4.2. Pavement mount 20
5.4.3. Soil mount 22
5.5. Electrical connection 25
5.5.1. Power cable 25
5.5.2. Tethered charging cable 27
5.6. Wired interconnection 29
5.7. Finishing installation 31
6. Dynamic Power Management for Business
(optional) 33
6.1. Internal connections 33
6.2. Technical specications 33
6.2.1. EMpro power meter 33
6.2.2. Rogowski current sensor 35
6.3. Installing the DPM for Business module 35
6.4. Connecting the Business Pro charge point
to the EMpro power meter 38
7. Commissioning 41
7.1. Conguration 41
7.2. Checks before commissioning 42
7.3. Switching on the product 42
7.4. Test charge point 42
7.5. Regular use 42
7.5.1. Start charging 42
7.5.2. Stop charging 42
7.5.3. Explanation of the LED colors 43
7.6. Tethered cable 43
7.7. Dynamic Power Management for Business
(optional) 43
8. Troubleshooting 44
9. Maintenance 47
9.1. Cleaning and sanitizing 47
9.2. Periodic maintenance 47
10. Disposal 47
Appendix A - EC Declaration of Conformity 48
Appendix B - EC Declaration of Conformity - Cable 49
Appendix C - Installation form 50
EN