EasyManua.ls Logo

SICE S 60 - INSTALLATION; Unpacking and Setup Precautions; Installation Clearances

SICE S 60
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
66 User Manual S60
5
Gripping the various projecting parts
of the structure in a manner not
recommended here is absolutely
forbidden.
When moving it after installation,
position the machine as shown in Fig.
5toguaranteethattheloadiscorrectly
balanced. If necessary, disconnect the
electro-hydraulic power unit.
CAUTION!
NB
In the models S60, the electro-hydraulic power unit can be disconnected from the rest
of the operating machine thanks to the non-interchangeable electric and hydraulic con-
nections (which avoid any risk of error when re-connecting).
INSTALLATION
Take the utmost care when unpacking, assembling, lifting and setting up the
machine as indicated below.
Failure to observe these instructions can damage the machine and compromise
the operator’s safety.
Remove the original packaging materials after positioning them as indicated on
the packaging and keep them for possible future shipping.
CAUTION!
Installation clearances
FORRADIOVERSIONSONLY:
Before starting with installation, make sure that no machines working
withthesamefrequencybandarelocatedwithinaradiusof200m
from the selected installation spot.
In the case of interference, request a different frequency band.
CAUTION!

Table of Contents

Related product manuals