-AINTENANCE AND FAULT TRACING6+
6
#
' #
-AINTENANCE AND FAULT TRACING
3IEMENS DIGITAL PROTECTION AND AUTOMATION RELAYS
ARE DESIGNED TO REQUIRE NO SPECIAL MAINTENANCE !LL
MEASUREMENT AND SIGNAL PROCESSING CIRCUITS ARE FUL
LY SOLID STATE AND THEREFORE COMPLETELY MAINTENANCE
FREE )NPUT MODULES ARE EVEN STATIC RELAYS ARE HER
METICALLY SEALED OR PROVIDED WITH PROTECTIVE COVERS
)F THE DEVICE IS EQUIPPED WITH A BACK
UP BATTERY FOR
SAVING OF STORED ANNUNCIATIONS AND THE INTERNAL TIME
CLOCK THE BATTERY SHOULD BE REPLACED AFTER AT MOST
YEARS OF OPERATION REFER TO 3ECTION 4HIS REC
OMMENDATION IS VALID INDEPENDENT ON WHETHER THE
BATTERY HAS BEEN DISCHARGED BY OCCASIONAL SUPPLY
VOLTAGE FAILURES OR NOT
!S THE DEVICE IS ALMOST COMPLETELY SELF
MONITORED
HARDWARE AND SOFTWARE FAULTS ARE AUTOMATICALLY AN
NUNCIATED 4HIS ENSURES THE HIGH AVAILABILITY OF THE
RELAY AND ALLOWS A MORE CORRECTIVE RATHER THAN PRE
VENTIVE MAINTENANCE STRATEGY 4ESTS AT SHORT INTER
VALS BECOME THEREFORE SUPERFLUOUS
7ITH DETECTED HARDWARE FAULTS THE RELAY BLOCKS ITSELF
DROP
OFF OF THE AVAILABILITY RELAY SIGNALS EQUIPMENT
FAULT
2ECOGNIZED SOFTWARE FAULTS CAUSE THE PROCESSOR TO
RESET AND RESTART )F SUCH A FAULT IS NOT ELIMINATED BY
RESTARTING FURTHER RESTARTS ARE INITIATED )F THE FAULT IS
STILL PRESENT AFTER THREE RESTART ATTEMPTS THE PROCES
SOR SYSTEM WILL SWITCH ITSELF OUT OF SERVICE AND INDI
CATE THIS CONDITION BY THE RED ,%$
"LOCKED ON THE
FRONT PLATE $ROP
OFF OF THE AVAILABILITY RELAY SIGNALS
EQUIPMENT FAULT
4HE REACTION TO DEFECTS AND INDICATIONS GIVEN BY THE
RELAY CAN BE INDIVIDUALLY AND IN CHRONOLOGICAL SE
QUENCE READ OFF AS OPERATIONAL ANNUNCIATIONS UNDER
THE ADDRESS FOR DEFECT DIAGNOSIS REFER TO 3EC
TION
)F THE RELAY IS CONNECTED TO A LOCAL SUBSTATION AUTO
MATION SYSTEM ,3! DEFECT INDICATIONS WILL ALSO BE
TRANSFERRED VIA THE SERIAL INTERFACE TO THE CENTRAL CON
TROL SYSTEM
%NSURE THAT THE CONNECTION MODULES ARE NOT
DAMAGED WHEN REMOVING OR INSERTING THE
DEVICE MODULES
7ARNING
2OUTINE CHECKS
2OUTINE CHECKS OF INTERNAL FUNCTIONS OR PICK UP VAL
UES ARE NOT NECESSARY AS THEY FORM PART OF THE CON
TINUOUSLY SUPERVISED FIRMWARE PROGRAMS 4HE
PLANNED MAINTENANCE INTERVALS FOR CHECKING AND
MAINTENANCE OF THE PLANT CAN BE USED TO PERFORM OP
ERATIONAL TESTING OF THE PROTECTION EQUIPMENT 4HIS
MAINTENANCE SERVES MAINLY FOR CHECKING THE INTER
FACES OF THE UNIT IE THE COUPLING WITH THE PLANT 4HE
FOLLOWING PROCEDURE IS RECOMMENDED
2EAD OUT OF OPERATIONAL VALUES ADDRESS BLOCK
AND COMPARISON WITH THE ACTUAL VALUES FOR
CHECKING THE ANALOG INTERFACES
(AZARDOUS VOLTAGES CAN BE PRESENT ON
ALL CIRCUITS AND COMPONENTS CONNECTED
WITH THE SUPPLY VOLTAGE OR WITH THE MEAS
URING AND TEST QUANTITIES
7ARNING
#IRCUIT BREAKER CLOSE CIRCUITS CAN BE TESTED DUR
ING TESTS OF THE MAIN PROTECTION EQUIPMENT 2E
SPECTIVE NOTES ARE GIVEN IN THE APPROPRIATE MANU
ALS OF THE MAIN PROTECTION RELAYS