Commission plant using the commissioning wizard
7
71
Siemens Graphical User Interface UI400 CE1U2348en
Building Technologies 2014-06-03
7 Commission plant using the commissioning
wizard
NOTICE
Startup response of the commissioning wizards.
● Depending on the controller, operating line 39 (OEM) of the room/operator
unit-specific section or the entire commissioning wizard can be suppressed at
initial power-up (initial commissioning).
● Depending on the controller, a query is displayed on the operator unit at the
end of the commissioning dialogs on whether to switch off Automatic start of
the commissioning wizards at the next power-up.
● The commissioning wizard can be queried at any time (see Section "Start
commissioning wizards [➙ 80]
"). Operating line 39 and the auto start setting is
The commissioning wizard is structured in a room/operator unit-specific part (in the
graphic white) and a plant-specific part (in the graphic gray).
l Notes on room/operator unit settings available in Section "Room/operator unit
parameters [➙ 86]".
l Notes on plant settings are available in user's guide for your controller.
l The entire room/operating-specific part as well as chapter or sub-chapter of the
plant-specific part can be repeated (in graphic: Redo).
l The chapter or sub-chapter of the plant-specific part can be skipped (in
graphic: Skip).
Structure
Repeat chapter and skip