3 Operating the Ethernet CP with
A-60
S7-CPs for Industrial Ethernet Configuring and Commissioning
Release 01/2007
C79000-G8976-C182-07
3.3 Configuring - Follow the Steps Below
A CP is managed in an S7 project just as the other modules. You use STEP 7 to
configure the hardware and create and manage the user software (see /6/).
Configuring a CP involves the following steps (the broken lines indicate options):
Programming the
SEND/RECEIVE interface
(see Section 4)
Create the Industrial Ethernet subnet (see 3.3.1)
Enter the Ethernet CP in the hardware configuration
(see 3.3.2)
Make further CP settings (see 3.3.4)
Configuring communication connections (Chap. 5)
- S7 connections /6/
- ISO transport connections
- ISO-on-TCP connections
- TCP connections
- UDP
Download the configuration to the PLC (see 3.5).
Configuration data in
the STEP 7 project
Check or set the network properties
Attach the Ethernet CP to the Ethernet subnet
(see 3.3.2)
Display the network attachments of a station (see 3.3.3)
alternative:
Program communication
connections
(see Chapter 6)
User programs in the
STEP 7 project