Requirements
● FF devices have been configured.
● Symbols have been created.
Procedure
You have the following options for configuring interconnections:
● Configure the interconnections in the PCS 7 Import/Export Assistant using templates.
● Create your own CFC charts.
Additional information
You can find additional information and step-by-step instructions in the configuration manual
Process Control System PCS 7; Engineering System
.
4.4.6 Configuring the OS
Information about the configuration of process pictures and diagnostics with operator stations
is available in the
Process Control System PCS 7; Operator Station
Configuration Manual.
Engineering
4.4 Using the applications
FOUNDATION Fieldbus
Commissioning Manual, 03/2013, A5E03880935-02 49